Lotte Mart Binh Duong

Construction site: Nguyen Trai Street, Binh Duong Province. Project scale: 1 block of 3 floors. Construction works: Bored piles, temporary road, storm water drainage system, internal roads and parking lot. Total construction area: 24.695 m2.

Construction of 187 mass piles, including: 

D1500 bored piles: 30 piles, 49.149m in length.

D1000 bored piles: 60 piles, 49.125m in length.

D1000 bored piles: 97 piles, 49.5m in length.