Construction details:
- Location: Ward 11, District 6, HCM City
- Total floor area: 91, 396.4 m2
- Size: 4 blocks (C1, C2, C3, C4)
- Block C1, C4: Each block has 25 floors ( similar as 85,6 m)
- Block C2, C3: Each block has 26 floors ( similar as 89 m)
- Progress: 20 months
- Contract value: 356.591.000.000 VND
- Proposal for Construction completion in 2015.